Parking lot foundation material

fullsizeoutput_cab4.jpeg

The zero - 2-1/4  has been delivered to the site, material which will be used as the first sub-foundation of 250mm of base to the parking lot. An additional 150MM of zero 3/4 will layer above, and then a final 2-1/2" of asphalt will be laid on top. The material will be spread throughout the site next week, now that almost all topsoil has been removed from the site.