Retention basin

jo6kdI3STGGh9luiAv8T0A.jpg

The vast water retention basin is being prepared on the eastern portion of the site, where surface water will be managed and percolated prior to being released into the storm sewer conduits. The orange cones in the background will be situated within the excavated portion, and then covered, with parking above.